| MRC |
Requirement Statement |
Characteristics |
| AFEC |
DISTANCE FROM CENTER OF MOUNTING HOLE TO EDGE ALONG THE WIDTH |
0.250 INCHES NOMINAL |
| AXPE |
CENTER TO CENTER DISTANCE BETWEEN FIRST AND THIRD MOUNTING HOLES |
1.407 INCHES NOMINAL |
| CWWM |
CLAMPING HOLE DIAMETER |
0.375 INCHES NOMINAL FIRST HOLE |
| CWWM |
CLAMPING HOLE DIAMETER |
0.500 INCHES NOMINAL SECOND HOLE |
| CWTD |
CLAMPING HOLE QUANTITY |
2 |
| ABKW |
OVERALL HEIGHT |
0.500 INCHES NOMINAL |
| STDC |
SURFACE TREATMENT DOCUMENT AND CLASSIFICATION |
MIL-C-5541,CL 1A MIL SPEC SINGLE TREATMENT RESPONSE |
| SFTT |
SURFACE TREATMENT |
ANODIZE |