| MRC |
Requirement Statement |
Characteristics |
| AFEC |
DISTANCE FROM CENTER OF MOUNTING HOLE TO EDGE ALONG THE WIDTH |
0.440 INCHES NOMINAL |
| CWXN |
DISTANCE FROM END TO FIRST CLAMPING HOLE CENTER |
0.620 INCHES NOMINAL |
| CWXC |
DISTANCE FROM END TO FIRST MOUNTING HOLE CENTER |
0.200 INCHES NOMINAL |
| BYGG |
BLOCK HEIGHT |
0.310 INCHES NOMINAL |
| CWXZ |
CENTER TO CENTER DISTANCE BETWEEN FIRST AND SECOND CLAMPING HOLES |
1.000 INCHES NOMINAL |
| AXPC |
CENTER TO CENTER DISTANCE BETWEEN FIRST AND SECOND MOUNTING HOLES |
1.000 INCHES NOMINAL |
| AXPE |
CENTER TO CENTER DISTANCE BETWEEN FIRST AND THIRD MOUNTING HOLES |
1.850 INCHES NOMINAL |
| CWTD |
CLAMPING HOLE QUANTITY |
2 |
| MATT |
MATERIAL |
PLASTIC EPOXY |
| AZGM |
MOUNTING FACILITY |
UNTHREADED HOLE |
| ABTB |
MOUNTING HOLE DIAMETER |
0.195 INCHES MINIMUM AND 0.201 INCHES MAXIMUM |
| ABTJ |
MOUNTING HOLE QUANTITY |
3 |
| ABKW |
OVERALL HEIGHT |
0.620 INCHES NOMINAL |
| ABHP |
OVERALL LENGTH |
2.240 INCHES NOMINAL |
| ABMK |
OVERALL WIDTH |
0.880 INCHES NOMINAL |
| STYL |
STYLE DESIGNATOR |
RECTANGULAR |